On January 1 the magnet rule stops asking who made it and starts asking who mined it
Everyone read the headline: no Chinese magnets in defense work from January 1, 2027. Almost nobody read paragraph (c). Three of the exceptions in DFARS 252.225-7052 change shape on the same date, which means parts you currently treat as exempt stop being exempt, and the clause's covered-material list is now narrower than the statute it implements. Here is the delta, the arithmetic for the 50-percent test, and the 102-day triage order.
If you supply the Department of War and your bill of materials contains a magnet, a tungsten counterweight, or a tantalum part, one sentence in your contracts changes on January 1, 2027. Today the clause forbids covered material melted or produced in China, Russia, North Korea, or Iran. From January 1 it forbids covered material mined, refined, separated, melted, or produced there (DFARS 252.225-7052(b)(1)).
That is the part everyone has read. Here is the part almost nobody has: three of the exceptions in paragraph (c) change shape on the same date. Parts you are legitimately treating as exempt today stop being exempt that morning, and the change is decided by weight, not by sourcing. That is the delta worth 102 days of your attention.
What a "covered material" is, precisely
A covered material is one of five specific things, not a category of risk. Under the clause, covered materials are samarium-cobalt magnets, neodymium-iron-boron magnets, tantalum metals and alloys, tungsten metal powder, and tungsten heavy alloy or any finished or semi-finished component containing it. Covered countries are North Korea, China, Russia, and Iran. The clause flows down: paragraph (d) makes you responsible for inserting its substance into subcontracts, including subcontracts for commercial products, and you may not alter it except to name the parties.
Two things follow that people get wrong. First, this is not a rare-earth rule. Tungsten and tantalum are in it, and the U.S. upstream position there is arguably worse. Tungsten has not been mined commercially in the United States since 2015 and the country remains more than 50% import-reliant; tantalum has not been mined domestically since 1959 and the U.S. was 100% net import-reliant in 2025 (USGS Mineral Commodity Summaries 2026). Second, assembling in Texas does not make a magnet compliant if the oxide or alloy came from a covered country, which is the whole point of adding "mined, refined, separated."
The exception delta, line by line
This table is built from paragraph (c) of the clause as posted (MAY 2024 text, DFARS change 5/7/2026, page last updated September 18, 2026). It is the part of the rule that decides whether a specific part number on your BOM is your problem.
| Exception in 252.225-7052(c) | Through Dec 31, 2026 | From Jan 1, 2027 | What it means for your BOM |
|---|---|---|---|
| COTS end item containing a covered material | Shelter is lost only if the item is 50% or more tungsten by weight | Shelter is lost if the item is 50% or more covered material by weight | Magnet-dense and tantalum-dense COTS assemblies lose the shelter on January 1. This is the change that catches people. |
| Mill products not yet incorporated | Only tantalum metal/alloy or tungsten heavy alloy mill products (bar, billet, wire, plate…) | Any covered material as a mill product, not yet incorporated | Broader, not narrower. Magnet stock in mill-product form gains a shelter it did not have. |
| Electronic device | Excepted, unless the contract says otherwise | Same text | Unchanged in the clause, but EO 14415 §2(f) directs a review of how this exemption is applied, so do not build a program on it. |
| Recycled NdFeB magnet | Excepted if milling of the recycled material and sintering of the final magnet happen in the U.S. | Same text in the clause | The statute was broadened to samarium-cobalt in December 2025; the clause still says NdFeB only. See the gap below. |
| Nonavailability determination | Available per DFARS 225.7018-4 | Available, but EO 14415 §2(a) stops routine waivers from the same date absent an accepted mitigation plan | The paper escape hatch narrows on exactly the day the scope widens. |
Read the first row twice. Through December 31, a commercially available off-the-shelf item keeps its exception unless it is half tungsten. From January 1, the test applies to any covered material. Statutorily, that is one word: the future amendment to 10 U.S.C. 4872(c)(3)(A)(i) strikes "tungsten" and inserts "covered material" (Pub. L. 116-283 §844(a)(2), as amended).
The 50-percent test, with the arithmetic shown
The test is mass of covered material over mass of the item. Three illustrative assemblies (the masses below are invented for the arithmetic, not measurements of real parts):
- A frameless BLDC servo motor, 1,200 g, with 96 g of NdFeB rotor magnets. 96 ÷ 1,200 = 8%. Under 50%, so the COTS exception survives January 1, assuming the motor is genuinely COTS, sold in substantial quantities commercially and supplied without modification.
- A magnet rotor assembly: magnets bonded to a steel hub, 210 g total, 118 g of NdFeB. 118 ÷ 210 = 56%. Over 50%. Exempt today, not exempt on January 1. Nothing about the part changed; the test did.
- A tungsten heavy alloy counterweight, effectively 100% THA. Already over the pre-2027 tungsten threshold, so no change. It was never sheltered.
The decision rule, in the order you can actually run it: Is there a covered material in it? → Is the item COTS? → Is the covered material 50% or more of its mass? → If not COTS, is it an uncombined mill product? → Is it an electronic device? → Is it a recycled NdFeB magnet milled and sintered in the U.S.? If none of those land, you need compliant provenance or a waiver. Note that you cannot run step three at all unless someone recorded two masses per part, which almost nobody has.
The gap between the clause and the statute
I have not seen this gap written up elsewhere, and I would want a contracts lawyer to confirm it before you act on it. Compare the covered-material list in the clause against the current statute:
| Covered material | 10 U.S.C. 4872(f)(1) | DFARS 252.225-7052(a) |
|---|---|---|
| Samarium-cobalt magnets | Yes | Yes |
| Neodymium-iron-boron magnets | Yes | Yes |
| Tungsten metal powder | Yes | Yes |
| Tungsten heavy alloy (and components containing it) | Yes | Yes |
| Tantalum metals and alloys | Yes | Yes |
| Molybdenum | Yes, added by Pub. L. 119-60 §844(a)(1), Dec 18, 2025 | Not listed |
| Gallium, germanium | Yes, effective Dec 18, 2027 | Not listed |
The statute also gained a new prohibition effective January 1, 2027 that the clause does not mirror in the same words: the Secretary may not enter into a contract for covered material mined, refined, or separated in a covered nation: a contracting prohibition, not only a delivery prohibition. And 4872(c)(3)(C) now extends the recycled-magnet exception to samarium-cobalt, while the clause's version still names NdFeB only.
The practical reading: the clause in your contract is what you are signing against, so comply with the clause. But do not build a molybdenum sourcing plan on the clause's silence, because the statute is where this is heading and DFARS catches up. Track molybdenum, gallium, and germanium in the same records now, as fields you populate rather than a project you restart in 2028.
Why this is a data-model problem before it is a sourcing problem
Look at what the clause asks and then look at your ERP. The clause names five production steps. Your part master has one field called "country of origin." One field cannot answer a five-verb question, and "USA" in that field is the most common false-compliant record in the defense industrial base. GAO has made the same point about DoD itself: visibility thins out below the first tier, and the trail to separated feedstock often disappears entirely.
So the record you need, per covered-material instance rather than per part, is roughly:
- Part number and revision.
- Covered-material type, as one of the clause's five categories, not free text.
- Covered-material mass and parent-item mass, so the 50% test is computed, never asserted.
- Item class: COTS, mill product, electronic device, component, assembly.
- Supplier, and the sub-tier the material actually came from.
- Five origin fields (mined, refined, separated, melted, produced), one per verb in the clause.
- Evidence document, issue date, signer, and expiry.
- Recycled flag, U.S. milling flag, U.S. sintering flag, to support a (c)(1)(iv) claim.
- Status as a derived value: compliant, non-compliant, unknown. Never typed by hand.
- Last-verified and next-verify dates.
That is a schema, not a spreadsheet column. Getting it populated is mostly a document-extraction job. Supplier declarations arrive as PDFs and email attachments, and pulling the vendor, part, step, country, and expiry out of each one by hand is where these systems rot. Deterministic code for the structured fields, a model for the messy ones, a human checkpoint where a wrong answer becomes a False Claims Act problem: that is the AI operations system pattern pointed at compliance paperwork instead of invoices. And because supplier lists and program associations are CUI-adjacent, this is usually the wrong thing to ship into a consumer SaaS cloud; the on-premises posture exists for exactly this data.
We have not run this engagement for a defense client and I am not going to pretend otherwise. What we do have is a method: our production-readiness checklist exists because the last 10% (the export that works under deadline, the field that cannot be left blank, the audit trail nobody demoed) is where systems fail. A compliance record is the same shape of problem as a production system. If producing the full provenance for a shipped unit is a novel scramble rather than a standard export, the record does not exist yet.
The 102-day order of operations
October 18, 2026 is when EO 14415 §4(c) requires a strategy to accelerate source qualification; around January 16, 2027 the §3(a) supply-chain mapping guidance is due, and its centerpiece is a complete indentured bill of materials tracing every component, part, software item, and material back to raw-material origin. That is the direction of travel regardless of how the January 1 date is enforced. Run this order, and the order matters:
- List every part containing a covered material. First, because you cannot triage a list you do not have. Query for motors, actuators, speakers, latches, couplings, sensors (magnets); counterweights, ballast, carbide tooling (tungsten); capacitors and high-temp alloys (tantalum).
- Record the two masses per part. Second, because that single number decides whether the COTS shelter you are relying on survives January 1.
- Sort by status-change × units shipping in Q1 2027 × requalification lead time. 102 calendar days is roughly 70 working days, which buys two or three requalifications, not twenty. Sequence by what ships soonest.
- Send one structured flow-down request per supplier, not per part, asking for the five origin fields by name. Paragraph (d) makes the flow-down your obligation, and suppliers answer one structured request far better than a stream of part-level emails.
- Decide per part: requalify, substitute, or mitigation plan. Last, because EO 14415 §2(b) requires a mitigation plan to document exhaustive efforts to find compliant material, and steps 1 through 4 are what generates that evidence. A mitigation plan written before the search is a plan that fails §2(c), which says failure to qualify a domestic source is not non-availability.
Where this breaks
I am not a lawyer and this is not legal advice; the clause in your contract governs, and a contracts attorney should confirm any reading here before you rely on it. The clause text above is as posted at DFARS change 5/7/2026; DoD could issue a class deviation or Congress could move the date, and neither would surprise me given that major suppliers have said publicly they will not be ready. U.S. NdFeB demand was roughly 48,000 tonnes in 2025 against about 300 tonnes of domestic supply (The Oregon Group, July 30, 2026, citing Arthur D. Little data reported by Reuters), and China still accounts for the large majority of mining, refining, and sintered magnet output (IEA). The clause-versus-statute gap is my reading of two primary texts, not DoD guidance. The worked masses are arithmetic illustrations, not real parts. Supplier-side timelines are forward-looking: when REalloys announced (vendor-published, June 10, 2026) that qualification-grade dysprosium and terbium were expected in Q4 2026, its own release carried a long list of the ways that could slip.
None of that changes the homework. Whether the date holds, slips, or arrives with waivers attached, the thing being asked for is a record you do not currently keep, at a granularity your part master cannot express. That part is worth doing now, because it is the same record the drone and UAS component rules want, the same record EO 14415 wants, and the same record the next clause will want.
FAQ
What changes in DFARS 252.225-7052 on January 1, 2027? The restriction extends from covered material "melted or produced" in a covered country to covered material "mined, refined, separated, melted, or produced" there. At the same time, the commercially-available-off-the-shelf exception's carve-out changes from items that are 50% or more tungsten by weight to items that are 50% or more any covered material by weight, and the mill-product exception broadens from tantalum and tungsten heavy alloy to any covered material in mill-product form.
What is a covered material under DFARS 252.225-7052? Samarium-cobalt magnets, neodymium-iron-boron magnets, tantalum metals and alloys, tungsten metal powder, and tungsten heavy alloy or any finished or semi-finished component containing tungsten heavy alloy. Covered countries are North Korea, China, Russia, and Iran. Note that 10 U.S.C. 4872 also lists molybdenum, and adds gallium and germanium effective December 18, 2027, which the clause as posted does not yet reflect.
Does the COTS exception still apply after January 1, 2027? Yes, but narrowed. A COTS end item containing a covered material remains excepted unless it is 50% or more covered material by weight, is an uncombined mill product, or falls outside the other paragraph (c) carve-outs. The practical effect is that magnet-dense and tantalum-dense COTS assemblies that were sheltered through December 31, 2026 may not be on January 1, with no change to the part itself.
Does this rule apply to subcontractors? Yes. 10 U.S.C. 4872(b) applies the prohibition to prime contracts and subcontracts at any tier, and paragraph (d) of the clause requires the contractor to insert the substance of the clause into subcontracts and other contractual instruments for items containing a covered material, including those for commercial products, unless an exception applies.
Can I still get a waiver for non-compliant magnets in 2027? Waivers still exist but the route narrowed. Executive Order 14415 (July 20, 2026) directs that from January 1, 2027 waivers under 10 U.S.C. 4872(c)(1) generally stop being issued unless the contractor submits a mitigation plan, accepted by the Secretary, that identifies the non-compliant source, documents exhaustive efforts to find compliant material, describes removal steps, and sets a firm timeline. The order also states that failure to qualify a domestic source does not by itself constitute non-availability.
What records do I need to prove compliance? At minimum, per covered-material instance: the material type as one of the clause's categories, the covered-material and parent masses so the 50% test can be computed, the item class, the supplier and actual sub-tier, and a separate origin field for each of the five steps the clause names (mined, refined, separated, melted, produced), each linked to a dated evidence document with a signer and an expiry. A single "country of origin" column cannot answer the question the clause asks.
If your covered-material provenance currently lives in a shared drive of supplier PDFs and one person's memory, the gap is a systems gap, not a sourcing gap. Stride TechWorks builds the internal tooling that turns supplier declarations into a queryable provenance record with a computed compliance status, on infrastructure you control when the data demands it. See AI operations systems, or how we work.
- Acquisition.gov: DFARS 252.225-7052, Restriction on the Acquisition of Certain Magnets, Tantalum, and Tungsten (MAY 2024 clause; DFARS change 5/7/2026)
- Office of the Law Revision Counsel: 10 U.S.C. 4872, Acquisition of sensitive materials from non-allied foreign nations (text in effect September 19, 2026, with future-amendment notes)
- The White House: Executive Order 14415, Securing America's Defense Supply Chains and Ensuring Domestic Acquisition of Critical Materials (July 20, 2026)
- Acquisition.gov: DFARS 225.7018-4, Nonavailability determination
- The Oregon Group: US suppliers not ready for Pentagon's 2027 ban on China-sourced magnets and minerals (July 30, 2026)
- USGS: Mineral Commodity Summaries 2026, tungsten
- USGS: Mineral Commodity Summaries 2026 (tantalum and molybdenum)
- IEA: Rare Earth Elements, executive summary (share of global mining, refining, and magnet production)
- REalloys (vendor-published): Qualification effort for defense-grade heavy rare earth materials to meet the DFARS 252.225-7052 January 1, 2027 deadline (June 10, 2026)
- GAO-24-107176: Critical Materials (DOD implementation of rare earth and critical material procurement requirements)
Fact-reviewed September 21, 2026.